New External Toilet Block
In the picture you can see the new toilet block being built along the Capland Street wall. The scaffolding is being taken down so that the playground surface can be renewed.Most of the windows are now in place and you can really get a good idea of what the new buidling will look like.(If you click on the picture it will enlarge and you can see it in more detail.)
A New Year
Thank you Mark Ziuziakowski for reminding me that it was about time I updated the building blog. Lots has happend in the exisiting building over the summer.
The old kitchen has now become two classrooms. Currently 4 Lilac and 4 Violet are based in them but once the new building is complete the reception classes will move into them.
They are equipped with new, height adjustable, interactive whiteboards.The dining hall has also been decorated. This will become a hall for the nursery and reception once the work is complete. For the time being it remains our lunch hall.
In the new building the classrooms are progressing. They have now been plastered and work has started on installing the electrics.